Skip Navigation
Division of IT Home
University of Missouri System
University of Missouri-Columbia
Division of IT: Network Services

Wireless Network Expansion and Upgrade Status

The MU wireless network is in a constant state of change and many groups are requesting additional or upgraded wireless coverage for their locations. In addition, MU is in the process of upgrading the aging wireless infrastructure that has been in place for several years. Since it is going to take up to two years to complete the planned expansion and upgrades, priorities have to be set.

There are several lists of priorities. In many cases we will be able to work down multiple priority lists in parallel speeding up the overall project. There are three major priority areas for wireless network expansion and upgrades.

The highest priority for expansion is to provide wireless coverage in the common areas and lounges of the residence and dining halls. Coverage to student rooms is NOT planned at this time; student rooms have excellent wired data network connectivity today. This project is in process and we hope to have all of these areas covered by the end of the fall semester 2006. Residential Life has provided the Division of IT with a short list of high priority locations, the rest will be done in alphabetical order. New residential facilities will open with wireless coverage.

Building Date completed
College Avenue Housing 8/11/2006
Cramer Hall 2/15/2006
Mark Twain Hall 2/15/2006
Defoe Hall 2/23/2006
Discovery Hall 8/1/2006
Excellence Hall 8/1/2006
Gillett Hall 3/8/2006
Hudson Hall 3/15/2006
Jones Hall 8/1/2006
Respect Hall 8/1/2006
Responsibility Hall 8/1/2006
Rollins Dining Hall 8/1/2006
Southwest Campus Housing 8/1/2006
Wolpers 4/21/2006
Johnston Hall 5/12/2006
Plaza 900 8/1/2006
Laws Hall 9/8/2006
Lathrop Hall 9/8/2006
Graham Hall 11/1/2006
Baker-Park Hall Remodeling
Pershing Dining Hall 10/13/2006
Bingham Dining Hall Remodeling
Dobbs Dining Hall
Gardner-Hyde Hall Remodeling
Hatch Hall 8/9/2007
Schurz Hall Remodeling
Stafford Hall 10/15/2006
McDavid 8/8/2007

The second priority is to upgrade the older, less functional wireless components that exist on the network today. This will provide several benefits: it will provide for consistent feature-availability network-wide; increase the maximum communication speed from 11 to 54 Mbs; replace the old 802.11 b capable units with tri-mode 802.11 a/b/g technology; provide a higher density of wireless access points to improve coverage; add enhanced authentication methods; provide for improved security.

Buildings Equipment type Date completed
1105 Carrie Franke Drive (OAC) 2300 8/18/2006
Academic Support Center 2300 2/21/2007
Agriculture Building & Lab 2300 4/10/2007
Anheuser Busch Natural Resources 2300 5/16/2007
Animal Science Research Center 2300 2/7/2007
Black Culture Resource Center 2300 2/5/2007
Brady Fountain Area
Chemistry Building & Lab Addition 2300 10/1/2006
Clydesdale Hall 2300 3/29/2007
Connaway Hall 2300 3/9/2007
Eckles Hall 2300 11/3/2006
Engineering Building North 2300 4/25/2007
Engineering Building West 2300 4/25/2007
Fine Arts Annex 2300 5/21/2007
Fine Arts Building 2300 5/16/2007
Gannett Hall 2300 3/29/2007
Heinkel 2300 5/1/2006
Hill Hall 2300 3/8/2007
Hulston Hall (Law School) 2300 5/19/2007
Jesse Hall 2300 1/20/2006
Lafferre Hall 2300 5/15/2007
Lee Hills 2300 5/16/2007
Lefevre Hall 2300 5/22/2007
Lewis Hall 2300 5/20/2007
Life Sciences 2300 4/26/2006
London Hall 2300 3/7/2007
McAlester Hall & Annex 2300 10/26/2006
Middlebush Hall 2300 10/26/2006
President Residence 2300 7/1/2006
Reynolds Alumni Center 2300 5/25/2007
Schlundt Annex 2300 9/1/2006
Schweitzer Hall 2300 5/16/2006
Telecom-North Switching Node 2300 8/18/2006
Telecom 2300 4/21/2006
Townsend Hall 2300 3/28/2007
Tucker Hall 2300 2/14/2007
University Hall 2300 6/7/2006
Student Success Center 2300 9/10/2006
Veterinary Science Building 2300 6/5/2007
Whitten Hall 2300 5/30/2006
Conley House 2300 6/21/2007
General Classroom Building 2300 6/20/2007
Verterinary Diagnostic Lab Annex 1 & 2 2300 6/6/2007
Veterinary Medical Building 2300 6/13/2007
Math Science Building & Annex 2300 7/3/2007
Schlundt Hall 2300 7/30/2007
Mumford Hall 2300 8/1/2007
Student Recreation Center 2300 7/31/2007
Professional Building 2300 7/30/2007
Gwynn Hall 2300 8/25/2007
Memorial Stadium Press Box 2300 8/9/2007
Mizzou Sports Arena 2300 8/8/2007
Gentry Hall 2300 8/13/2007
Geology Building 2300 8/14/2007
Stanley Hall 2300 8/23/2007
Psychology Building 2300 8/24/2007
Memorial Union 2300 10/24/2007
Waters Hall 2300 8/27/2007
Stewart 2300 8/31/2007
Neff Hall 2300 8/28/2007
Neff Annex 2300 8/29/2007
Switzler 2300 9/20/2007
Tate Hall 2300 10/17/2007
Turner Garage 2300 9/4/2007
Virginia Avenue Parking Garage 2300 10/4/2007
Hearnes Center 2300 11/8/2007
Brady Commons 2300 10/22/2007
F.A.P.R.I. 2300 9/27/2007
East AV14 Parking Lot Emergency Phone Cisco
Simmons Field Cisco
Stankowski Field Cisco
Whitten Hall 2300 8/18/2006
Walton Track/Soccer Stadium Cisco
Walter Williams Hall Renovations
Agriculture Engineering 2300 8/30/2007
Arts & Science Building 2300 11/5/2007
Cornell Hall 2300 11/6/2007
Dalton Research Center 2300 8/21/2007
Ellis Library & Annex 2200
Lowry Hall 2300 10/12/2007
McReynolds 2300 9/26/2007
Physics Building 2200
Rock Quarry Center 2300 10/5/2007
Alpha Gamma Rho Cisco
Chi Omega Cisco
Delta Delta Delta Cisco
Kappa Alpha Theta Cisco
Sigma Nu Cisco
Delta Upsilon 2300 10/24/2007

The third priority is to expand coverage to campus locations that have not been provided wireless coverage in the past:

Buildings by priority Date completed
Chemical Recycling Building & Trailer 7/1/2006
Crowder Hall
Curtis Hall
KOMU-TV 10/26/2006
Museum Support Center
Read Hall
Research Park Development Building 7/1/2006
Trowbridge Livestock Center
Brewer Fieldhouse
Calf Barn
Campus Mail
Chancellor's Residence
Devine Pavillion
Gustin Golf Course & Club House
Hitt Street Parking Structure
Lab Animal Center
Loeb Hall
McKee Gym
Melvin H Marx Building
MU Libraries Depository
Noyes Hall
Old 63 Warehouse
Parker Hall
Pickard Hall
Raptor Rehab Service Building
Research Reactor
Research Reactor Machine Shop
Stephens Hall
Surplus Property Warehouse
Swallow Hall
Tom Taylor Athletic Building
University Avenue Parking Garage
University Press
University Printing
Maguire Building

Finally, there are some locations at which Division of IT does not plan to provide wireless coverage:

Building
ADA Consulting Group
Bradford Farms
Colonies Clinic
Corporate Lake
Faurot Field Maintenance
Greek Housing
Greenhouse #4
Greenhouse #5
Greenhouse #18
Greenhouse #19
Greenhouse #20
Greenhouse #21
Greenhouse #22 (USDA)
IML Warehouse
Manor House
Middlebush Farm
Nursing School
Poultry Nutrition
Rehab Education and Training
Rollins Bottom
Science Instrument Shop
South Farms Complex
Stephens Hall
Stonebridge Park Offices
Student Parent Center
The Tennis Center at Mizzou
University Heights
University Place
University Terrace
University Village
University of Missouri
Division of Information Technology
615 Locust Street, Columbia, MO 65211
(573)882-2000
Copyright ©2007 Curators of the University of Missouri.
DMCA and other copyright information.
An equal opportunity/affirmative action institution.
Revised September 27, 2007